Skip to content
Anchorbelievers Architecture
Almada International School, entrance to the expansion
← All projectsDESIGN COORDINATION · CONSTRUCTION SUPPORTEducation

Almada International School — Expansion

As its first pupils moved up through the years, the school grew with them: a second building for the primary years and Cambridge Lower Secondary, set into the slope beside the first.

The expansion brings together classrooms, science laboratories, a dining hall, sports fields and an underground car park. Built within a single year, right beside a school in full activity, it asked for every decision to be resolved long before it reached the site.

Our role was to bring every discipline together. Structure, ventilation, water, power and data were coordinated with the architecture into one precise whole, so that each space would work as intended: daylight where children read, quiet where they concentrate, fresh air in every classroom.

On site, we followed the works from the first excavation to the final finishes, from the precast structure assembled piece by piece to the acoustic ceilings, the oak-toned joinery and the light floors that give the interiors their calm.

Room by room, drawings became places ready to welcome children, carrying forward the care and the natural palette of the first phase.

Location
Sobreda, Almada, Portugal
Years
2025–2026
Client
Almada International School
Programme
Primary and lower secondary classrooms, laboratories, dining hall, sports fields, car park
Scope
Design coordination, construction support
Architecture
Contravento, Lda
Landscape
Território Periférico
Area
c. 4,560 m²
Photography
Anchorbelievers
Almada International School, expansionAlmada International School, expansion
Almada International School, expansionAlmada International School, expansionAlmada International School, expansion
Almada International School, expansionAlmada International School, expansionAlmada International School, expansion

FROM SITE TO SCHOOL

Excavation beside the first phase
Excavation beside the first phase
Precast walls lifted into place
Precast walls lifted into place
The car park level, structure in place
The car park level, structure in place
Ribbed façade panels and windows
Ribbed façade panels and windows
Services running along the corridors
Services running along the corridors
Waterproofing the roof
Waterproofing the roof
The first phase seen from the new roof
The first phase seen from the new roof
The metal stair tower and drainage works
The metal stair tower and drainage works
Construction photos: Anchorbelievers
NEXT PROJECTBeyond International School →